A worksite generator is a power supply solution. Proper preparations before starting can ensure the generator operates safely and efficiently. Three key areas need attention: site assessment, equipment inspection, and personnel coordination. The following information is provided for your reference.
1. Site Evaluation
Conduct thorough terrain inspection where the worksite generator will operate. Verify ground stability, clearance from flammable materials (minimum 3m distance), and accessibility for maintenance vehicles. Identify proper fuel storage locations downwind from ignition sources. For noise-sensitive areas, position the worksite generator with natural barriers or sound deflectors.
2. Pre-Operation Checks of worksite generator
Mechanical Inspection: Examine the worksite generator for oil leaks, loose bolts, and belt tension. Confirm coolant levels meet manufacturer specifications.
Electrical Systems: Test battery charge and terminal connections. Ensure all power cables are undamaged with proper insulation ratings for expected loads.
Fuel Quality: Drain water separators and replace stale diesel (beyond 6 months storage). Modern worksite generators often require ultra-low sulfur fuel to meet emission standards.
3. Operational Protocols of worksite generator
Brief all personnel about the worksite generator emergency shutdown procedure and exclusion zones. Post clear signage indicating high-voltage areas. Establish a maintenance logbook to record runtime hours, fluid changes, and irregular vibrations. For parallel systems, synchronize voltage/phase settings before interconnection.
Thorough preparation of worksite generator can prevent common field faults. I hope the above introduction can provide users with some reference.